SERVICES — DATACENTER MIGRATION SUPPORT
Datacenter Migration Support
Planned, executed, and documented — we manage the physical and logistical side of your datacenter migration from start to finish.
What We Do
Moving IT infrastructure is one of the most complex and risk-intensive operations any organisation can undertake. netconn manages the physical and logistical side — we plan carefully, execute precisely, and document everything.
- Physical server and rack relocation (within site or between facilities)
- Full infrastructure migration planning and sequencing
- Rack consolidation and decommissioning
- Structured cabling at source and destination
- Hardware labeling, inventory tracking, and asset documentation
- Coordination with carriers, logistics providers, and destination DC teams
- Go-live support and post-migration verification
- Handover report with full asset inventory and photos
How It Works
Discovery
Assess current environment: rack layouts, cable runs, power requirements, and dependencies.
Migration Plan
Step-by-step migration schedule with risk mitigation and rollback steps.
Pre-migration Prep
Labeling, documentation, and dry-run checks at both sites.
Execution
Physical migration carried out on-site by our engineers, following the agreed sequence.
Verification
All systems checked and confirmed operational at the destination.
Handover
Full documentation delivered: asset list, photos, rack diagrams, cabling maps.
Your infrastructure arrives at the destination exactly as it left — planned, documented, and confirmed before we move a single cable.
Types of Migrations We Handle
- Server room to colocation facility
- Colocation to colocation (same or different provider)
- On-premises to on-premises (office relocation or building move)
- Rack consolidation within an existing datacenter
- Decommission and secure disposal of legacy hardware
Coverage & Planning Lead Time
🌎 On-site Coverage
Switzerland — DACH region on request.
📅 Planning Lead Time
2–4 weeks recommended for mid-size migrations. Emergency migrations available on request.
🌟 FAQ
Do you handle transport between sites?
Yes. We coordinate closely with logistics and carrier partners and can manage the full transport process on your behalf.
Can you migrate live environments with minimal downtime?
Yes. We work with your team to plan migration windows that minimise service interruption — including after-hours and weekend execution.
How long should I plan for a datacenter migration?
We recommend 2–4 weeks of planning lead time for mid-size migrations. Emergency migrations are available on request.
What types of migrations does netconn handle?
Server room to colocation facility, colocation to colocation (same or different provider), on-premises to on-premises (office relocation or building move), rack consolidation within an existing datacenter, and decommissioning and secure disposal of legacy hardware.
What documentation do I receive after a migration?
A full handover report including an asset inventory, photos, rack diagrams, and cabling maps.
Where does netconn provide migration coverage?
On-site coverage in Switzerland, with the DACH region available on request.
Why netconn for Datacenter Migrations?
🔍 Multi-Rack Migration Experience
Hands-on experience with complex, multi-rack migrations — from single server moves to full facility relocations.
📞 One Point of Contact
Vendor and carrier coordination included. You deal with one contact — netconn manages the rest.
🔒 NDA-Ready & Enterprise-Cleared
NDA-ready and cleared for sensitive enterprise and financial environments. Trusted by Akamai, Cloudflare, GTT, Citadel Securities, and Telesol.
📋 Zero-Surprise Approach
Everything is planned, documented, and confirmed before we move a single cable. No last-minute improvisation.
Planning a Move?
Tell us about your environment and your target site. We’ll scope the migration and get back to you with a plan.